Problem

The outdoor unit tripped on high pressure at 3 pm daily. The office had no cooling during peak hours and the previous AMC vendor had replaced a sensor twice.

What we did

Our engineer logged the discharge pressure and found a choked condenser coil plus a failing fan motor capacitor. We chemically cleaned the coil over a weekend, replaced the capacitor and recalibrated the pressure switch.

Result

No trips in 45 days. Power draw down 11 percent. The office moved its AMC to ChillMasters.

A 40-seat office with one VRF outdoor unit tripping every afternoon.